Download PDF
Overview
Swiftline were responsible for design development, co-ordination and installation of the commercial mechanical, electrical and public health engineering services to this 20,000 square metre commercial development. The works included a ‘Cat A' fit-out of the office floors which was instructed post-contract. The development spans six office floors. The entire commercial construction engineering phase, including commissioning, was just 52 weeks
- Project name:
- Cam Road
- Client:
- Metropolitan Police
- Contract Type:
- Design & Build
- Architect:
- Nicholas Burwell
- Sector:
- Commercial Fit Out